One of the busiest San Diego hotels added square footage to the existing stamped concrete of their porte-cochere. The Sheraton San Diego Hotel & Marina had 5000 square feet of existing stamped concrete that needed to match up to the new stamped concrete areas.  Project Consultant Gil Koury had to match old existing stamped concrete to the newly added stamped areas and all while the hotel remained open and guests move past our work areas checking in and out without skipping a beat. Gil and his crew accomplished this in two weeks and the hotel kept running as usual and they couldn't be happier with the results!  The old stamped concrete was resurfaced with our 11-10 which is made up of EC-11 Water-Based Epoxy and SC-10 Acrylic Topcoat and then a Water-Based Stain finish was applied to blend the mismatched areas together seamlessly.


 